Change control software: six quality systems read against the change record
Published , reviewed
Verdict
- Best overall
- Veeva QMSChange controls run beside deviations, CAPAs, audits, complaints and supplier quality, and Veeva's current help pages describe eight of the nine rows below: each eSignature a read-only record of name, title, date and time and meaning, audit history with no retention limit, and a validation package binder for each release.
- Best for a small lab
- QualioChange control sits in the same system as documents, training and CAPA, the signature is the user's email plus a Qualio password (SSO users included), and customers receive a validation pack with test scripts and a Part 11 assessment.
- Best with CAPA and events
- TrackWise DigitalIt fits teams that want quality events, CAPA and change control in one system; its Part 11 and Annex 11 assessment, dated March 2019, describes old and new values in the trail, a password at each signing and a validation package for each release.
Fig. 01A change control record is how a lab shows that nothing it relies on moved without someone deciding it should. The method, the SOP, the supplier, the software: each changed on a date, for a reason, after an assessment, with named people signing what they reviewed and approved. Kept in software, that record is a Part 11 record, and its signatures stand in for handwritten ones.
This page reads six quality systems with a change control module against the nine Part 11 rows a change record leans on, then covers what those rows cannot: the impact assessment, the filing decision and the vendor's own releases. For the suite as a whole, see the Part 11 eQMS comparison; for the documents most changes end up revising, the document control comparison.
The two kinds of change control
A lab runs change control twice, often in the same module. The first kind changes what you make or test: a method, a procedure, a specification, a supplier. A predicate rule asks for it. The second kind changes the computerised system itself, and Part 11 and Annex 11 ask for it in different words.
Scroll sideways for both columns
| Question | Process or product change | Computerised-system change |
|---|---|---|
| What changes | A procedure, a test method, a specification, a piece of equipment, a room, a supplier, a device design. | The software, its configuration, its interfaces, the infrastructure under it, and the documents that describe the system. |
| The rule that asks for control | Drug CGMP: procedures “including any changes” are approved by the quality control unit § 211.100(a), and so is “any change in such specifications, standards, sampling plans, test procedures” § 211.160(a). GLP: “Significant changes in established standard operating procedures shall be properly authorized in writing by management” § 58.81(a). Devices: the design controls of ISO 13485 Clause 7.3, which § 820.10(c) applies to class II and III devices. | “Revision and change control procedures to maintain an audit trail that documents time-sequenced development and modification of systems documentation” § 11.10(k)(2). “Any changes to a computerised system including system configurations should only be made in a controlled manner in accordance with a defined procedure” Annex 11 § 10. Changes to master records in a computer “instituted only by authorized personnel” § 211.68(b). |
| Who approves | Drug makers: the quality control unit, by rule. GLP facilities: management, in writing. Device makers: whoever the design and document procedures name. | Whoever your procedure names, usually the system owner and quality. Neither Part 11 nor Annex 11 § 10 names the roles. |
| What the impact assessment asks | Product quality, process or method validation, documents, training, and “whether a change to the regulatory filing is required” ICH Q10 3.2.3(b). | What it does to the validated state: what to retest, which records and signatures it touches, which system documents change. |
| Proof the change held | “After implementation, an evaluation of the change should be undertaken to confirm the change objectives were achieved and that there was no deleterious impact on product quality” ICH Q10 3.2.3(d). | Validation documentation “should include change control records (if applicable)” Annex 11 § 4.2, and periodic evaluation confirms the system remains “in a valid state” Annex 11 § 11. |
The two meet in the software. Revising an HPLC method is a process change that also changes the processing method in the chromatography data system; a new eQMS release is a system change that can alter how every approval in the quality system is signed. A good module holds both kinds on one record type, with an impact assessment that asks about each.
Part 11 and Annex 11 also split the work differently. § 11.10(k)(2) controls the documentation of the system; Annex 11 § 10 controls changes to the system itself, configuration included. A lab that only supplies the US can read (k)(2) narrowly; one that supplies the EU cannot (our Annex 11 guide covers when it applies).
Common misreading
“FDA does not enforce system change control.” The 2003 guidance does put § 11.10(k)(2) under its discretion on audit trails, but it keeps the predicate rules on dates, times and the order of events, lists “appropriate controls over systems documentation” among the provisions it enforces, and § 211.68(b) still says changes to records in a computer are “instituted only by authorized personnel”. Keeping the changed system validated is covered in our computer system validation guide for small labs.
The change record, request to closure
Whatever the software, a change record carries six parts: the request, the impact assessment, the approvals, the implementation, the verification and the closure. The impact assessment decides how much work follows. The worked example below asks four questions of every change: does it touch validation, which documents change, who needs training, and does it reach a regulatory filing (the question ICH Q10 3.2.3(b) asks outright).
Pick a change. Each one is pre-filled with a realistic example; change any impact and the signatures and tasks follow.
Change record, example only
Change the assay column and gradient in test method TM-014
- Type
- Process or product change
- Reason
- The current column is discontinued by its supplier; the replacement needs a longer gradient.
- Rule
- § 211.160(a): any change in test procedures is drafted by the responsible unit and reviewed and approved by the quality control unit.
Impact assessment
| Area | Impact | What it means here |
|---|---|---|
| Validation | affected | Method verification against the current validation report; system suitability limits rechecked. |
| Documents | affected | TM-014 to a new version; the processing method in the chromatography system. |
| Training | affected | Analysts who run TM-014 trained on the new version before it is effective. |
| Regulatory filing | to assess | If the method is in an approved application, decide the § 314.70 route before release testing uses it. |
Tasks before closure
- Validation work executed, approved and linked to this record before closure.
- New document versions approved; effective only once training is recorded.
- Training completed and recorded before the new version is effective.
- Filing decision recorded, with the name of who made it.
- Implementation
- New column qualified, processing method updated, TM-014 version 4 effective after training.
- Verification
- First three release runs meet system suitability; no out-of-trend results attributed to the change.
Signatures on this record
Each shows printed name, date and time, and meaning (§ 11.50(a))
- 01RequestChange ownerAuthorship
- 02Impact assessmentValidation leadReview
- 03Impact assessmentRegulatory affairsReview
- 04ApprovalQuality control unitApproval
- 05ImplementationImplementerResponsibility
- 06VerificationVerifier (not the implementer)Review
- 07ClosureQuality control unitApproval
Count the signatures. The first example carries seven, each with its own meaning: authorship for the request, review for each assessor, approval, responsibility for the work, review for the verification, and approval again at closure. Part 11 asks that each show the printed name, the date and time, and “the meaning (such as review, approval, responsibility, or authorship)” (§ 11.50(a)), and that each be linked to this record so it cannot be “excised, copied, or otherwise transferred” (§ 11.70). A module with one approve button and no meaning puts the meaning in a free-text comment, where nothing enforces it.
Inspection risk
Approval signed after the work. A change implemented first and approved later leaves a stretch where the lab ran an unapproved procedure, and the time-stamped trail shows it: the approval's date and time sit after the implementation's.
When a change reaches a regulatory filing
This is the question that costs most when it is skipped. ICH Q10 asks for “an assessment to determine whether a change to the regulatory filing is required under regional requirements”. In the US, three rules set the answer for most products a small team ships.
Scroll sideways for all columns
| Product | Rule | What it asks of a change |
|---|---|---|
| Drug with an approved NDA | § 314.70 | “The NDA holder must assess the effects of the change before distributing a drug product made with a manufacturing change” (a)(2). A change with a “substantial potential to have an adverse effect” needs a supplement approved before distribution (b)(1); a “moderate potential”, a supplement at least 30 days before distribution (c)(1); a “minimal potential”, the next annual report (d)(1). |
| Device cleared through a 510(k) | § 807.81(a)(3) | A new premarket notification when the device “is about to be significantly changed or modified in design, components, method of manufacture, or intended use”, for example a change that “could significantly affect the safety or effectiveness of the device”. Not required when the change is consistent with a cleared predetermined change control plan (PCCP) (b)(1)(ii). |
| Device with an approved PMA | § 814.39 | A PMA supplement, approved by FDA, “before making a change affecting the safety or effectiveness of the device” (a). A change that does not affect safety or effectiveness goes in the post-approval periodic report instead, and a change consistent with an approved PCCP needs no supplement (b). |
A contract lab or a GLP test facility usually holds no application of its own; the filing belongs to the sponsor. The change record still needs the question answered and the name of the sponsor contact who was told. In software that is one field and one routing rule: when the filing flag is set, regulatory affairs signs before quality can approve. Our register has no row for it, so it sits in the demo tests below.
For a device maker, the design change itself runs through the design controls that § 820.10(c) brings in from ISO 13485 Clause 7.3. We could not read the paywalled standard, so check its change clause in your own copy.
Requirement by requirement
The rows run in the order a change record meets them: who may raise and approve, the signatures, the trail, copies, then the vendor's own validation documents and the Annex 11 statement. The open-system row (§ 11.30) is left out: it is about records moving through systems you do not control, not about approving a change. The eQMS comparison carries it.
Scroll sideways for all vendors
| Requirement | MasterControl Quality Excellence | Veeva QMS | TrackWise Digital | Reliance | Qualio | Dot Compliance eQMS |
|---|---|---|---|---|---|---|
| Access and authority checks by role§ 11.10(d), (g) | verified | verified | verified | stated | verified | not stated |
| Signature shows name, date and time, and meaning§ 11.50 | verified | verified | verified | stated | stated | stated |
| Two distinct components to sign§ 11.200(a) | verified | verified | verified | stated | verified | stated |
| Signature linked to its record so it cannot be moved§ 11.70 | stated | verified | verified | stated | stated | stated |
| Secure, computer-generated, time-stamped audit trail§ 11.10(e) | verified | verified | verified | stated | verified | stated |
| Audit trail kept as long as the record§ 11.10(e) | stated | verified | verified | stated | verified | stated |
| Accurate, complete copies for inspection§ 11.10(b) | verified | verified | verified | stated | verified | not stated |
| Validation documentation to support the customer's own validation§ 11.10(a) | verified | verified | verified | verified | verified | verified |
| EU Annex 11 statementEU GMP Annex 11 | not stated | stated | verified | stated | stated | stated |
verified: read on the vendor's own documentation on 2026-10-22. stated: the vendor claims it; we did not check. not stated: nothing published.
TrackWise Digital's statuses come from the vendor's Part 11 and Annex 11 assessment. We read it on 2026-10-22; the document itself is dated March 2019, so ask for the assessment that matches the release you would buy.
Veeva QMS documents eight of the nine rows on its current help pages; TrackWise Digital's 2019 assessment covers nine. Veeva takes best overall here because the rows include the vendor's own release documents, and for a cloud system whose releases change your validated state, current documentation weighs more than older, fuller documentation. On the CAPA software comparison TrackWise Digital takes best overall, because CAPA is the job it is built around; here it takes the row for teams that run change, CAPA and quality events together.
Reliance and Dot Compliance eQMS state more of these rows than they describe. For them, the demo tests below carry most of the weight.
When the vendor's release is the change
A cloud eQMS changes under you: the vendor ships, and your validated system is now a different system. Annex 11 § 10 makes that release a change you control, and your validation documentation should include its change record (Annex 11 § 4.2). What keeps that work affordable is the vendor's own release documentation, so this is the one row worth reading vendor by vendor.
Scroll sideways for all columns
| Vendor | Validation documents for customers | What the vendor's page describes |
|---|---|---|
| MasterControl Quality Excellence | verified | IQ, OQ and PQ test protocols offered to customers, updated with each build. The vendor's page |
| Veeva QMS | verified | A validation package binder for each release, in a vault customers can log in to. The vendor's page |
| TrackWise Digital | verified | A validation package is available for each release. The vendor's page |
| Reliance | verified | A Validation Execution Package for self-validation, or validation consulting. The vendor's page |
| Qualio | verified | Described on the vendor's own documentation. The vendor's page |
| Dot Compliance eQMS | verified | A validation documentation package is available to all customers in the subscription. The vendor's page |
verified: read on the vendor's own documentation on 2026-10-22. stated: the vendor claims it; we did not check. not stated: nothing published.
A release package covers what the vendor tested, not your configuration. Your part is the change record, a retest of the features you rely on sized by risk, and the updated system documents. The CSV lifecycle for small labs covers the documents; the CSA vs CSV guide covers how far risk-based testing can go.
Change-control tests for a demo
These are the rows that make change control software different from a document system, and our register does not rate them: we read no vendor pages on them, so we give no status. Run them as a script in each demo, and write the ones you need into your user requirement specification.
- 01
No approval before the assessment
Try to approve a change with the impact assessment half empty. The approval step should not open.
“operational system checks to enforce permitted sequencing of steps and events” § 11.10(f)
- 02
One signature per assessor, each with its meaning
Have validation, regulatory and QA each sign. Each signature should carry its own meaning, not one shared approval.
printed name, date and time, and meaning § 11.50(a)
- 03
Links to the documents and training it touches
Open a change that revises an SOP. The record should point to the exact new version and the training items, and the new version should not go effective before the training is recorded.
evaluated by expert teams so the change is “technically justified” ICH Q10 3.2.3(c)
- 04
A validation flag that holds closure
Mark validation as affected. Closure should wait until the validation record is linked to the change.
validation documentation includes “change control records (if applicable)” Annex 11 § 4.2
- 05
A filing decision with a name on it
Look for a field that records whether the change needs a regulatory filing, the route chosen and who decided.
“an assessment to determine whether a change to the regulatory filing is required” ICH Q10 3.2.3(b)
- 06
Old and new values when an assessment is edited
Edit the impact assessment after approval. The trail should show the old value, the new value, who and when.
“Record changes shall not obscure previously recorded information” § 11.10(e)
- 07
Effectiveness criteria set before the change
Check that the record asks for the success criteria at approval and schedules the post-change review against them.
“Prospective evaluation criteria for a proposed change should be set” ICH Q10 3.2.3(c)
- 08
The system's own releases
Ask how you hear about a release before it reaches your production environment, and what release notes and validation documents come with it.
changes to a computerised system made “in a controlled manner” Annex 11 § 10
- 09
The whole record on one printout
Print or export a closed change. Every signature should show its name, date and time and meaning, and the trail should come with it.
accurate and complete copies § 11.10(b); the manifestation on any printout § 11.50(b)
Two tests reach into other modules. A change that comes out of a CAPA should link back to it, which the CAPA comparison reads from the CAPA side, and the training items a change opens land in your training system, read in the Part 11 LMS comparison.
Vendor by vendor
Each card shows the six rows a change approval leans on. Some quality vendors' pages could not be read on the read date, so they are not in this lineup; a missing vendor is not a verdict on it. This lineup also has no suite built for device makers alone, so the third verdict row names a use case instead; device makers should read the medical device QMS comparison.
MasterControl Quality Excellence
eQMSdocument control- What it is
- A quality management suite covering document control, change control, training, audits, risk and quality events. MasterControl also offers validation tools with pre-written test protocols.
- Who it fits
- Life sciences manufacturers and labs, from startups to large companies, that want one suite for every quality process.
| Requirement | Status |
|---|---|
| Access and authority checks by role§ 11.10(d), (g) | verifiedAdministrators set permissions for each user and each document vault. |
| Signature shows name, date and time, and meaning§ 11.50 | verifiedSigned records capture the username, date and time, and meaning of the signature. |
| Two distinct components to sign§ 11.200(a) | verifiedA separate approval password is needed to sign, apart from the login password. |
| Secure, computer-generated, time-stamped audit trail§ 11.10(e) | verified |
| Audit trail kept as long as the record§ 11.10(e) | stated |
| Validation documentation to support the customer's own validation§ 11.10(a) | verifiedIQ, OQ and PQ test protocols offered to customers, updated with each build. |
verified: read on the vendor's own documentation on 2026-10-22. stated: the vendor claims it; we did not check. not stated: nothing published.
Check with the vendor
Some rows above are stated or not stated on MasterControl's own pages. Ask MasterControl for its validation documentation and test the control in your own validation before you rely on it.
MasterControl's own Part 11 pageread 2026-10-22
Veeva QMS
eQMS- What it is
- A cloud quality management application on the Veeva Vault platform. It runs deviations, CAPAs, change controls, internal and external audits, complaints, lab investigations and supplier quality.
- Who it fits
- Pharma, biotech and device companies that bring sites, suppliers and contract manufacturers into one system.
| Requirement | Status |
|---|---|
| Access and authority checks by role§ 11.10(d), (g) | verified |
| Signature shows name, date and time, and meaning§ 11.50 | verifiedEach eSignature holds the signer's name, title, signing date and time, and the meaning chosen. |
| Two distinct components to sign§ 11.200(a) | verifiedSigners enter username and password; saved browser passwords are blocked. |
| Secure, computer-generated, time-stamped audit trail§ 11.10(e) | verified |
| Audit trail kept as long as the record§ 11.10(e) | verifiedDocument and object audit history have no retention limit. |
| Validation documentation to support the customer's own validation§ 11.10(a) | verifiedA validation package binder for each release, in a vault customers can log in to. |
verified: read on the vendor's own documentation on 2026-10-22. stated: the vendor claims it; we did not check. not stated: nothing published.
Veeva Systems' own Part 11 pageread 2026-10-22
TrackWise Digital
eQMS- What it is
- A cloud quality management system covering quality events, deviations, CAPA, audits, change control, documents, training, complaints and supplier quality. Sparta Systems is part of Honeywell.
- Who it fits
- Pharma, biotech and device companies that want quality events, CAPA and change control in one system.
| Requirement | Status |
|---|---|
| Access and authority checks by role§ 11.10(d), (g) | verified |
| Signature shows name, date and time, and meaning§ 11.50 | verifiedRead in the vendor's Part 11 and Annex 11 assessment, dated March 2019. |
| Two distinct components to sign§ 11.200(a) | verifiedUser ID and password; the password is needed at each signing. |
| Secure, computer-generated, time-stamped audit trail§ 11.10(e) | verifiedRecords user ID, old and new value, and time stamp; entries cannot be deleted. |
| Audit trail kept as long as the record§ 11.10(e) | verified |
| Validation documentation to support the customer's own validation§ 11.10(a) | verifiedA validation package is available for each release. |
verified: read on the vendor's own documentation on 2026-10-22. stated: the vendor claims it; we did not check. not stated: nothing published.
Sparta Systems' own Part 11 pageread 2026-10-22
Reliance
eQMS- What it is
- A configurable cloud quality management platform, formerly ETQ Reliance, with applications for document control, CAPA, change, audits, nonconformance and supply chain quality. Its Life Sciences Compliance application adds Part 11 controls and validation support.
- Who it fits
- Larger manufacturers and life sciences companies with many quality processes to configure.
| Requirement | Status |
|---|---|
| Access and authority checks by role§ 11.10(d), (g) | stated |
| Signature shows name, date and time, and meaning§ 11.50 | stated |
| Two distinct components to sign§ 11.200(a) | stated |
| Secure, computer-generated, time-stamped audit trail§ 11.10(e) | stated |
| Audit trail kept as long as the record§ 11.10(e) | stated |
| Validation documentation to support the customer's own validation§ 11.10(a) | verifiedA Validation Execution Package for self-validation, or validation consulting. |
verified: read on the vendor's own documentation on 2026-10-22. stated: the vendor claims it; we did not check. not stated: nothing published.
Check with the vendor
Some rows above are stated or not stated on Octave's own pages. Ask Octave for its validation documentation and test the control in your own validation before you rely on it.
Octave's own Part 11 pageread 2026-10-22
Qualio
eQMSdocument control- What it is
- A cloud quality management system for life sciences covering documents, training, CAPA, change control, events, audits, suppliers and design controls. Customers receive a validation pack with test scripts and a Part 11 assessment.
- Who it fits
- Drug, biotech, device and CRO teams building or replacing their eQMS.
| Requirement | Status |
|---|---|
| Access and authority checks by role§ 11.10(d), (g) | verifiedAudit trail access needs the Quality User role. |
| Signature shows name, date and time, and meaning§ 11.50 | stated |
| Two distinct components to sign§ 11.200(a) | verifiedEmail (user ID) plus a Qualio password form the signature, also for SSO users. |
| Secure, computer-generated, time-stamped audit trail§ 11.10(e) | verified |
| Audit trail kept as long as the record§ 11.10(e) | verifiedAudit trail records are kept for the lifetime of the customer's system. |
| Validation documentation to support the customer's own validation§ 11.10(a) | verified |
verified: read on the vendor's own documentation on 2026-10-22. stated: the vendor claims it; we did not check. not stated: nothing published.
Check with the vendor
Some rows above are stated or not stated on Qualio's own pages. Ask Qualio for its validation documentation and test the control in your own validation before you rely on it.
Qualio's own Part 11 pageread 2026-10-22
Dot Compliance eQMS
eQMS- What it is
- An eQMS built on the Salesforce platform with modules for documents, training, complaints, change, CAPA, quality events, suppliers and audits. A Salesforce licence is not required to use it.
- Who it fits
- Pharma, biotech and device companies that want an eQMS on the Salesforce platform.
| Requirement | Status |
|---|---|
| Access and authority checks by role§ 11.10(d), (g) | not stated |
| Signature shows name, date and time, and meaning§ 11.50 | statedThe page names capture of the signature meaning; name and time are not described. |
| Two distinct components to sign§ 11.200(a) | stated |
| Secure, computer-generated, time-stamped audit trail§ 11.10(e) | stated |
| Audit trail kept as long as the record§ 11.10(e) | stated |
| Validation documentation to support the customer's own validation§ 11.10(a) | verifiedA validation documentation package is available to all customers in the subscription. |
verified: read on the vendor's own documentation on 2026-10-22. stated: the vendor claims it; we did not check. not stated: nothing published.
Check with the vendor
Some rows above are stated or not stated on Dot Compliance's own pages. Ask Dot Compliance for its validation documentation and test the control in your own validation before you rely on it.
Dot Compliance's own Part 11 pageread 2026-10-22
How we read the vendors
Verdicts are editorial: no vendor can buy a verdict position or displace another vendor.
verified means we read the control described on the vendor's own documentation (help centre, validation pack page, compliance paper or trust page) on 2026-10-22. stated means the vendor claims it and we did not check it. not stated means the vendor publishes nothing on it.
FDA keeps no list of certified or approved Part 11 software. Compliance is a validation claim each regulated company makes for its own use of a system, so a vendor's Part 11 claim is where your validation starts, not where it ends.
Questions
Is a change control record a Part 11 record?
When a predicate rule requires it and you keep it electronically, yes. A drug maker's procedure changes must be “reviewed and approved by the quality control unit” (§ 211.100(a)), so the change record carrying that approval is a required record, and an electronic signature on it stands in for a handwritten one. Part 11 then asks for the controls on the record and the signature.
Does FDA still enforce § 11.10(k)(2)?
FDA's 2003 guidance puts § 11.10(k)(2) under its enforcement discretion on audit trails, and in the same breath says you must still meet the predicate rules on dates, times and the order of events. It also lists “appropriate controls over systems documentation” among the provisions it intends to enforce. If you supply the EU, Annex 11 § 10 has no such discretion.
Is a vendor's software update a change we have to control?
Yes. Annex 11 § 10 covers “any changes to a computerised system including system configurations”, and a cloud vendor's release changes the system you validated. Raise a change for each release, read the release notes, and size the retest by risk; the CSA validation scope planner helps you decide which features need scripted tests.
What is the difference between a change and a deviation?
A change is planned and approved before it happens. A deviation is a departure that already happened, and the rule is that it “shall be recorded and justified” (§ 211.100(b)). A deviation that should become permanent goes through change control afterwards; it does not become the new procedure on its own. The deviation management comparison reads the systems that hold the other half.
Does every change need a regulatory filing?
No. For an approved drug, § 314.70 sorts changes by their potential for an adverse effect: major (prior-approval supplement), moderate (supplement 30 days before distribution) and minor (annual report). A cleared device needs a new 510(k) only for a change that could significantly affect safety or effectiveness, or a major change in intended use (§ 807.81(a)(3)). What every change does need is a recorded decision.
Who has to approve a change in a small GLP lab?
§ 58.81(a) says “Significant changes in established standard operating procedures shall be properly authorized in writing by management”, and § 58.81(d) asks for a historical file of SOPs and all revisions with their dates. Your own SOP names who else signs. Write those roles into your user requirement specification so the system enforces them.
Sources
- 21 CFR Part 11, Electronic Records; Electronic Signatures, eCFRread 2026-10-22
- Part 11, Electronic Records; Electronic Signatures: Scope and Application (guidance, 2003), FDAread 2026-10-22
- 21 CFR 211.100, Written procedures; deviations, eCFRread 2026-10-22
- 21 CFR 211.160, Laboratory controls: general requirements, eCFRread 2026-10-22
- 21 CFR Part 211, CGMP for Finished Pharmaceuticals (§ 211.68(b)), eCFRread 2026-10-22
- 21 CFR 58.81, Standard operating procedures (GLP), eCFRread 2026-10-22
- 21 CFR 314.70, Supplements and other changes to an approved NDA, eCFRread 2026-10-22
- 21 CFR 807.81, When a premarket notification submission is required, eCFRread 2026-10-22
- 21 CFR 814.39, PMA supplements, eCFRread 2026-10-22
- 21 CFR Part 820, Quality Management System Regulation (§ 820.10), eCFRread 2026-10-22
- Q10 Pharmaceutical Quality System (guidance, April 2009), FDAread 2026-10-22
- EudraLex Volume 4, Annex 11: Computerised Systems (2011), European Commissionread 2026-10-22