Validation
5 tools, 4 guides, 1 comparison
Validation answers § 11.10(a): the system does what you need it to do, and you can show that it does. These pages size that work for a small lab rather than a large pharmaceutical site.
Read the CSV lifecycle, what FDA's computer software assurance guidance changes, and where GAMP 5's categories fit, then generate the plan, the requirements, the protocols and the trace as editable templates.
Fig. 01Tools
Comparisons
Guides
- Computer system validation (CSV) for small labs17 min read
The CSV lifecycle sized for a small lab: requirements, risk, IQ, OQ and PQ, the report and periodic review, and what goes in the pack.
- CSA vs CSV: what changed12 min read
CSA vs CSV side by side: what FDA's 2026 CSA guidance changes, what it leaves alone, and one quality system planned both ways.
- What is GAMP 5?15 min read
GAMP 5 in plain words: what ISPE's guide is for, its life cycle, the software categories by name, and how it sits with Part 11, CSA and Annex 11.
- Excel spreadsheets under Part 1114 min read
When an Excel spreadsheet can hold GxP data under Part 11, the controls it needs, and when to move the calculation into a system.